π Scope Summary
0
Total Items
0
Completed
0%
Overall Progress
8
Rooms / Areas
π₯ Critical Path
β Data guy (ASAP) β β‘ Electrician / 3-phase core-drill β β’ Waterproofing / leak test β β£ Carpenter / door frames β β€ Mortar cove β β₯ Final skim + sand β β¦ Micro cement first coat
π 4-Week Schedule
πWeek 1 β Jul 14β18Book trades, place orders, Nas stairwell decision, data guy on-site
β‘Week 2 β Jul 21β253-phase core-drill, A/C, plumbing, electrical rough-in + patch
π¨Week 3 β Jul 28βAug 1Waterproofing + leak test, carpentry, close all sheetrock
π¨Week 4 β Aug 4β8Mortar cove, final skim/sand, inspect, FIRST COAT
β οΈ Decisions Pending
Stairwell wall finish β Nas: wood / wallpaper / stoneConstraint: no room for tile (window hits wall). Brian's lean: wallpaper
Kids bath fixtures β vanity, mirror, sink, toilet
Bidet in kids bath β confirm outlet run
Shower wall tile + pebble stone β master bath
Confirm master bed window leak β fixed or needs caulk?
β Clear-to-Coat Sign-off (per room)
β‘ All penetrations cut & closed (data/elec/AC/plumbing) β‘ Rough-in tested β‘ Waterproofing passed (wet areas) β‘ Door frames floated flush β‘ Sheetrock holes patched + cured β‘ Corners coved, cracks packed β‘ Final skim + sand done β‘ Substrate inspected β CLEAR TO COAT
P1 β Book Now (Critical Path)
P1 ASAP Data / Low-VoltageLaundry cable reorgβupper cabinet hub; corridor data pull at 1st guest BR; master-bath stubs dressed. Blocks coating in 3 rooms.
P1 Electrician3-phase core-drill corridorβpantry; laundry sub-panel power; light repositions; Govee installs; bidet outlet; shower elec test
P1 A/C TechVent covers (master bed Γ1, master bath Γ2); A/C drain-plug access holes (kids room)
P2 β Schedule
P2 PlumberWhole-house water heater install; Kohler pressure test; rainfall showerhead; wall-hung toilet finalize + leak check
π§ Kids Room β Prep
Fix window brackets
Cut A/C access hole behind unit (drain plug maintenance)
Cove floor-to-wall corners with mortar
Install door frames β float flush for invisible doors
Re-skim + sand all walls & ceilings β ready to coat
π Mushroom Room β Prep
Standard prep (brackets, re-skim/sand, cove corners, float door frames)
Repair hole in closet ceiling
Caulk + prep large window before final mudOne of the two large windows
Buy Install 4 new Govee ceiling lights
β
A/C rear access already cut
π Kids Bathroom β Prep
Remove towel rack hangers; fill holes
Fix the shower floor
Install + mud door frames; pack gaps with mortar
Elec Run bidet outlet to toilet area
Buy Replace 2 lights with new Govee
Final skim coat where needed β proceed
Fixtures to Select / Buy
Vanity
Mirror
Sink
Toilet
πͺ Upstairs Corridor β Prep
3-phase Core-drill corridorβpantry + run feedersRemove sheetrock, core-drill down to pantry. Run roofβupstairsβpantry. Patch after. DO BEFORE SKIM.
Data Pull hallway data line at 1st guest BRPop ceiling hole, pull data line out. Before final skim.
Square + center ceiling access hole over panel; fit permanent cover
Reposition hallway ceiling lights
Install + mud all hallway door framesPer frame: install β fit door β screw tight β remove β mud
Pack all floor cracks with mortar
Skim coat everything β ready to coat
πͺ Stairwell Feature Wall
Decision Finalize with Nas: wood / wallpaper / stoneNo room for tile β window hits wall directly. Brian's lean: wallpaper.
π§Ί Laundry Room β Prep
P1 ASAP Data guy: rerun cables to upper-cabinet hub
Elec Power sub-panel from upstairs hallway feed
Swap 1 spotlight β 2 smaller spotlights (back wall)
Plumb Install larger whole-house water heater
Fill bottom gaps with mortar
Quick skim coat walls + ceiling
Finish door frame β mount door, mud in β ready to coat
ποΈ Master Bedroom β Prep
AC Install vent covers on A/C exhaust
Fix sheetrock around pocket door to master bath
Check cables; fix pot light; clean window-covering pocket
Check windows for leaks; caulk if neededPossible bottom intrusion β may already be fixed
Fill floor-to-wall cracks with mortar
New skim coat everything + final sand
Master Closet
Source 2 bar-style doors (NOT pocket) for closet opening
π Master Bathroom β Surfaces
Cement board on shower back wall (controls wall)
Cement-board / cover interior side of pocket door
Trim all spray foam at lights; confirm waterproof
Final skim coat
Shower β Waterproofing & Plumbing
Shower pan topping + leak test (MUST PASS)
Pebble stone shower floor (confirm selection)
Pressure-test Kohler system once morePressure gauge already in place β ready to test
Rainfall showerhead: find pieces, read instructions, install
Order missing showerhead screws (or alternate)
Measure + order shower glass + all hardware
Lighting & Electrical
Full electrical run-through β confirm all wiring
Seal all shower lights (ceiling + under-bench)
Clean up back-wall pocket LED
Toilet Room (off master bath)
Fix sheetrock above door
Install sheetrock to close in pocket door
Finalize wall-hung toilet + controls; leak check
Vents / Ceiling
Identify + install covers for both vents
Repair 2 ceiling holes
π Procurement List
Govee ceiling lights Γ4 Mushroom
Govee lights Γ2 Kids Bath
Vanity Kids Bath
Mirror Kids Bath
Sink Kids Bath
Toilet Kids Bath
Bar-style doors Γ2 Master Closet
Shower glass + hardware Master Bath
Rainfall showerhead screws Master Bath
Shower wall tile Master Bath
Pebble stone Master Bath
Vent covers Γ3 Master Bed+Bath
Whole-house water heater Laundry
Ceiling access cover Corridor